WiMAX360

Everything you need to know about WiMAX

Azlan Abdullah
  • Male
  • Kuala Lumpur
  • Malaysia
Share 

Azlan Abdullah's Friends

Azlan Abdullah's Groups

 

Azlan Abdullah's Page

Latest Activity

Profile Information

Interests
Surfing Internet, Window Shoping, Travelling, Collecting Stamp, Gardening, Driving, Reading IT Book
About Me
Name : Azlan Bin Abdullah

Personal Particulars
Age:38
Nationality : Malaysia
Gender : Male
Marital Status: Single
Permanent Residence : Malaysia

Highest Education

1st Highest Education
Level : Degree
Grade : -
Field of Study : Information of Technology
Institute / University : Open University Malaysia
Located In : Malaysia
Graduation Date :Final Year (finish early Mac 2008)

2nd Highest Education
Level : Diploma
Grade : Pass
Field of Study : Information of Technology
Institute / University : Binary Business School
Located In : Malaysia
Graduation Date :1995

3rd Highest Education
Level : MLVK Certificate
Grade : Pass
Field of Study: Electrical (Basic and Intermediate)
Major : Domestic and Industrial
Institute / University : City Collage of Technology
Located In : Malaysia
Graduation Date : 1991
Current Company
Data Efektif Sdn. Bhd. (Current April 2006 - till now), Sapura Transmission Sdn. Bhd. (1991- April 2006)
Company Description
Involve with 3G Node B (Nokia and Alcatel)
Involve with Preventive and Corrective Maintenance for Nokia Flexihooper
Involve with Node B Alcatel Swap to Node B Nortel.
Involve with Implementation, Installation and Commissioning with Nokia Flexihoper and Alcatel 7G, 14G, 15G and 18G.
Involve with Goverment Intergrated Radio Network (GIRN) - Nokia Siemens
Civil and Electrical.
Structure Cabling
Computer Hardware
Project Management
Current Position
Network Engineer / Project Coordinator ( Telecommunication )
Areas of Expertise
Preventive and Corrective Maintenance Nokia Flexihopper Micro Wave for Celcom 3G for 1st phase and 2nd Phase at Johor Region.
• Involved as Project Manager and Troubleshooting Nokia Flexihopper Micro Wave - < 400 sites.
• Liase with Celcom and Nokia for updated Preventive and Corrective Maintenance.
• Monitoring replacement of faulty unit and Stock balance with document and Data Tracking.
Government Integrated Radio Network – GIRN
• Involved with Sapura Research Sdn. Bhd. for Pre Site Survey for Government Integrated Radio Network – GIRN
• Preparation Site Survey Report for Government Integrated Radio Network - GIRN
MICROWAVE TRANSMISSION – CELCOM 2nd Phase Nokia Mini Link
• Involved in installation and commissioning mini link Nokia FlexiHopper 1+1 13GHz, 18GHz
• Involved site survey for mini link Nokia FlexiHopper.
• Involved and Site Preparation Proposal for CME 3G site location.
• Involve with 160 sites mini link Klang valley area
• Performed site survey & site supervision.
• Coordinate with Subcon, Nokia, Celcom for new site survey and installation mini link.
• Meeting with Nokia, Celcom for updating site progress.
MICROWAVE TRANSMISSION – CELCOM 2nd Phase Alcatel Swap
• Involved site survey for Swap Nokia to Alcate BTS including HOT Swap
• Involved and Site Preparation Proposal for CME 3G site location.
• Involve with 160 site Klang valley area
• Performed site survey & site supervision.
• Coordinate with subcon, nokia, celcom for new site survey and installation new mini link.
• Meeting with Nokia, Celcom for updating site progress.
Operasi Latihan Tentera (OPLAT)
• Involved with Dansyia for designing Network and power cable routing for Bilik Operasi Latihan Tentera
• Involved and Site Preparation Proposal for CME
• Performed site survey & site supervision.
Majlis Perbandaran Pulau Pinang (MPPP)
• Involved with Ramtronic for Tender Membekal, Memasang, Menguji, Mentauliah dan Menyelenggara Sistem Pemantauan Kamera Tanpa Wayar 4.9 Ghz in Majlis Perbandaran Pulau Pinang

KTMB RAWANG – IPOH DOUBLE TRACK
Involved with :
• Involved in installation and commissioning PDH and SDH (STM1) – Nokia Multiplexer
• Installation of Network Management System (NMS) - Nokia
• Rectifier installation, troubleshooting, testing & commissioning (SWICHTEC).
• Performed site survey & site supervision
• To coordinate & handle changes in project that could impact deliveries/process during project stage
• Report progress against the plan, resolve and report any issues that arise within PMIS (Artemis System)
• To coordinate, manage & follow-up the project team and all activities of cross functional resources in delivering project objectives effectively using appropriate methodologies and techniques that are within the project management life cycle and governance framework.
MICROWAVE – TALISMAN PROJECT.
Involved with :
• Involved in troubleshooting interfacing VSAT Link from City Bank building to offshore (bunga raya A - eastern) – Alcatel Multiplexer.
KTMB IPOH RELOCATION – DRB PROJECT
• Involved interfacing and monitoring PABX, Transmission (KTMB DTS) and IT System.
• Supervised CME Contractor.
• Coordinate with contractor and KTMB for work progress
3G WCDMA AND MICROWAVE TRANSMISSION – TELEKOM MALAYSIA / CELCOM
• Involved in installation and commissioning Nokia Node B (BTS) WCDMA 3G for Telekom Malaysia (Supreme and Optima)
• Installation including CME, antenna system and rectifier system for WCDMA BTS indoor and outdoor works.
• Involved in installation and commissioning mini link Nokia Flexi Hopper.
• Involved site survey for Nokia Node B (BTS) 3G and mini link Nokia Flexi Hopper.
• Involved and Site Preparation Proposal for CME 3G site location.
• Performed site survey & site supervision.

KMTB DIGITAL TRANSMISSION SYSTEM (DTS) – COMMUNICATION NETWORK (MALAYSIAN WIDE)
Involved with :
• Involved in installation and commissioning of PDH and SDH Equipment (STM1) – Nokia Multiplexer
• Installation of Nokia Network Management System (NMS) - Nokia
• Performed site survey for KTMB Station.
• Single Earthing System – responsible for Earthing system, design and implementation.
• Rectifier testing, commissioning and troubleshooting (ASCOM), battery commissioning.
• Performed site supervision for CME work.
• Involved in upgrading data system 64kbs and 2mbs for KTMB IT – Malaysian WIDE
• Involved with preliminary design, clarification meeting on technical issues.

PETRONAS RETAIL AUTOMATION SYSTEM - POINT OF SALE
Involved with :
• Involved in installation, troubleshooting, cabling, commissioning pc hardware and software in Petronas station (petrol pump).
• Performed logistic purchasing.

ADAM (PCN) NETWORK PROJECT
Involved with :
• Installation of Base Transceiver Station (BTS) including antenna system & Base Station Controller (BSC) of Nokia & Motorola.
• Installation of microwave link 15 GHz, 18GHz of Nokia, Prime Site, DMC & DMC Spectrum II (7GHZ, 14GHz, 18GHz & 23GHz).
• Installation of Prime Site and Remote Head for Indoor Coverage
• Installation of Outdoor Base Transceiver Station.
• Testing and commissioning of BTS and microwave link.
• Microwave link troubleshooting
• Sweep/VSWR testing - checking performance of antenna feeder using network analyzer & power meter
• Installation of tower mounted amplifier (increasing signal coverage).
• BTS, rectifier, battery & microwave link upgrading work
• BER testing
• Rectifier testing, commissioning & troubleshooting (ASCOM, CHLORIDE, HAWKER), battery commissioning.
• Do patching for 2Mbits Microwave link
• Performed site survey & site supervision
EDARAN TELECOMMUNICATION SDN. BHD.
Involved with :
• Involved in Installation of Siemens Equipment. (Fiber Optic) in RBS (Radio Base Station) Celcom.
- Synchronous Multiplexer (SMA4 R2 & SMA16 R2)
- Synchronous Line Regenerator (SLR 16 & SLR 16E)
- Synchronous Add/Drop Line Multiplexer (SLD 16 & SLD16E)

Tenaga Malaysia Berhad (TNB Project)
Involved with :
• Involved in installation, troubleshooting, cabling and commissioning Nokia Transmission Equipment. (PDH System)
• Performed site survey in TNB Substation & site supervision.
• Performed logistic purchasing.
Telekom Malaysia Berhad (TMB Project)
Involved with :
• Involved in installation, troubleshooting, cabling of OLTE (Optical Line Terminal Equipment) – Fujitsu 8Mb, 34Mb, 140Mb & 565Mb.
• Involved in installation, troubleshooting, cabling of DLC (Digital Loop Career) – Fujitsu.
• Involved in installation, troubleshooting, cabling of CSV (Centralized Supervisory) – Fujitsu.
• Involved in installation, troubleshooting, cabling of SDH (Synchronous Digital Hierarchy) – Fujitsu.
• Performed site survey in Telekom Exchange & site supervision.

Others Experience:-

•Performed logistic purchasing and updated stock balance.
•Prepare quotation.
•Monitoring test equipments for calibration.
•Performed site supervision for CME work.
•Involved with preliminary design, clarification meeting on technical issues.
•Able to manage project, re-present company for meetings and good co-ordination skill.
•Able to planned and forecast for new project.

Skill, Ability and Attitude:-
•Able to work independently, extra hour, travel outstation and work as a team
•Able to work with very minimal supervision
•Fast leaner and willing to venture into new areas.
•Familiar with Window 95, 98 and XP, Microsoft Office, Virtual PC, PC Anywhere, Antivirus Software and Microsoft Visio.
•Basic Knowledge of ADSL Router and Wireless Setting for Streamyx. (user)
•Basic Knowledge of Visual Basic 6.0, Pascal, Java Development Kit V1.4.0, C++.
•Basic Knowledge of Quality Inspection for Installation.
•Able to work independently, extra hour, travel outstation and work as a team
•Able to work with very minimal supervision
•Fast leaner and willing to venture into new areas.
•Willing to travel anywhere, anytime.
•Good communication with client, vendor and contractor.
•Ex - Members of Kesatuan Sekerja Sapura Holdings.
•Further study in Open University Malaysia Kuala Lumpur (OUM)
Degree in Information Technology (Final Year, early Mac 2008).

Training and Courses Attended:

July 1994

1. NOKIA-PDH (Pleisynchronous Digital Hierachy) -TNB Project
Venue: Pulau Langkawi.

April 1995

2. GSMINT Cellular System Course (Personnel Communication Network 1800 MHZ).
Venue: Sapura Nokia Kuala Lumpur.

June 1997

3. A. P. I. I. T (Asia Pacific Institute of Information Technology) – Computer Operating System.
Venue: Apple Centre, Kuala Lumpur.

June 1998

4. VISION ALIGNMENT PROGRAM. (Anak – Anak Syaikat Sapura Holding Sdn Bhd)
Venue: Awana Genting Resort, Genting Higlands, Pahang.

July 1998

5. EARTH EMERGENCY ACADEMY SDN BHD.
Venue: Century Paradise,Melawati, Ulu Klang, Kuala Lumpur.

April 2001

6. Introduction to SDH & NMS System
Venue: CommTel Network Solution Melbourne Australia.

Dec 2002

7. KTMB Track Safety Training - 038
Venue: Sekolah Latihan Keretapi Setul.

March 2004

8. NMS/10 C5.2 Administration (Nokia) – CommTel Network Solutions
Venue: Sapura Transmission Sdn. Bhd. Kuala Lumpur.

October 2004

10. Nokia – Training WCDMA BTSnfor Nokia 3G (3GULTINS, 3G SYSTRA, 3GULTCOM)
Venue: MMU CyberJaya (1 week )

11. Andrew Institute
Venue: Shah Alam
Training A5TDM-PS, A7TDF-PS, Accessories

June 2005

12. Artemis Training
Venue: Sapura Transmission
Conduct by: Cik Norhafizah Adnan
Project Management Office.

August 2006

13. Nokia – Training Microwave Flexi Hopper
Venue: MMU Cyberjaya (1 day)

April 2007

14. Nokia – Training Nortel Node B UMTS
Venue: Alcatel Malaysia Wisma Denmark Kuala Lumpur (2 Days)
Country of Residence
Malaysia
City
Kuala Lumpur
Why are you interested in WiMAX?
1. I want to know about the WiMax Technology
2. Network Configuration
3. Network Planning & Design
4. Project Implementation and Rollout
5. Preventive and Corrective Maintenance
6. Training
7. Job Vacancy

Comment Wall (7 comments)

You need to be a member of WiMAX360 to add comments!

Join this Ning Network

At 11:51am on October 18, 2008, Denny Primadani Setianto said…
my name denny from indonesia
nice to see u
At 1:07pm on February 6, 2008, Nidhal A S Odeh said…
Dear Mr. Abdullah
Alsalamo Alaikum

it is very nice to meet malaysian WiMAX people through this forum, hope that one day we can meet some where in malaysia.
Nice to meet You
Nidhal
At 12:33am on February 5, 2008, Indrani Roy said…
Hello Azlan

I take this opportunity to introduce Polaris Networks. www.polarisnetworks.net. Polaris has a long lineage of working with wireless technologies (WiMAX, Wi-Fi, RFID, wireless LAN, ATCA etc) in making test tools and protocol stacks, along with embedded software development and providing consultancy services.

Polaris is working with WiMAX technology for the last 4 years and has contributed significantly in making a PCT tester. We are providing testing services for WiMAX devices and consultancy services for WiMAX (both 16d and 16e). We are in the process of setting up a WiMAX Pre-Certification Lab in India.

You can reach me at 781-652-9603, or indrani_roy@polarisnetworks.net.

Thanks and Regards
Indrani Roy
BDM
Polaris Networks
your source for wireless technologies
www.polarisnetworks.net
At 3:35am on January 28, 2008, Mazlan Abbas said…
A'kum Azlan - what's your interests in WiMAX?
At 4:15am on January 23, 2008, Azlan Abdullah said…
Tq Skyline Leong..
At 1:11am on January 23, 2008, skyline leong said…
I add your as friend.
At 12:14am on December 13, 2007, Azlan Abdullah said…
Say hello to all WiMax Group member..
 
 

WiMAX360 Guidelines

Badge

Loading…
 

© 2010   Created by WiMAX Broadband Solutions

Badges  |  Report an Issue  |  Privacy  |  Terms of Service